# Procurement Flow Design v1
|
||||
|
||||
## 1. Executive Summary
|
||||
|
||||
**Задача:** 006-procurement-flow-design-v1
|
||||
**Дата:** 07 October 2026
|
||||
**Рабочая директория:** `/mnt/nas/hermes-test/Specs`
|
||||
|
||||
**Тип:** Design Task (не implementation)
|
||||
|
||||
**Цель:** Спроектировать procurement контур Purchase/PurchaseItem/Invoice/Resource/ResourceAllocation.
|
||||
|
||||
**Статус:** ✅ Design report создан
|
||||
|
||||
---
|
||||
|
||||
## 2. Current Model Analysis
|
||||
|
||||
### 2.1 Фактические модели
|
||||
|
||||
```
|
||||
Purchase
|
||||
├─ project_id (FK → Project)
|
||||
├─ vendor_id (FK → Vendor)
|
||||
├─ purchase_number
|
||||
├─ purchase_date
|
||||
└─ specifications (M:N → Specification через PurchaseSpecification)
|
||||
|
||||
PurchaseItem
|
||||
├─ purchase_id (FK → Purchase)
|
||||
├─ module_id (FK → Module)
|
||||
├─ quantity (Integer)
|
||||
├─ unit_price (Numeric)
|
||||
└─ description (Text)
|
||||
|
||||
PurchaseSpecification
|
||||
├─ purchase_id (PK, FK → Purchase)
|
||||
└─ specification_id (PK, FK → Specification)
|
||||
|
||||
Invoice
|
||||
├─ purchase_id (FK → Purchase)
|
||||
├─ vendor_id (FK → Vendor)
|
||||
├─ invoice_number
|
||||
├─ invoice_date
|
||||
├─ amount (Numeric)
|
||||
└─ description (Text)
|
||||
|
||||
Specification
|
||||
├─ project_id (FK → Project)
|
||||
├─ contract_id (FK → Contract)
|
||||
├─ specification_number
|
||||
├─ specification_date
|
||||
└─ specifications (M:N → Purchase через PurchaseSpecification)
|
||||
|
||||
SpecificationItem
|
||||
├─ specification_id (FK → Specification)
|
||||
├─ module_id (FK → Module)
|
||||
├─ quantity (Integer)
|
||||
└─ description (Text)
|
||||
|
||||
Resource
|
||||
├─ project_id (FK → Project)
|
||||
├─ module_id (FK → Module)
|
||||
├─ quantity (Integer)
|
||||
├─ invoice_number (String)
|
||||
├─ invoice_date (DateTime)
|
||||
├─ specification_number (String)
|
||||
├─ specification_id (FK → Specification, nullable)
|
||||
├─ invoice_id (FK → Invoice, nullable)
|
||||
└─ description (Text)
|
||||
|
||||
ResourceAllocation
|
||||
├─ resource_id (FK → Resource)
|
||||
├─ system_id (FK → System)
|
||||
├─ guardian_id (FK → Guardian, nullable)
|
||||
├─ quantity (Integer)
|
||||
└─ allocation_date (DateTime)
|
||||
```
|
||||
|
||||
### 2.2 Фактические relationships
|
||||
|
||||
| Relationship | Direction | Cardinality |
|
||||
|--------------|-----------|-------------|
|
||||
| Purchase.specifications | Purchase → Specification | 1:N |
|
||||
| PurchaseItem.purchase | PurchaseItem → Purchase | N:1 |
|
||||
| Invoice.purchase | Invoice → Purchase | N:1 |
|
||||
| Specification.purchases | Specification → Purchase | 1:N |
|
||||
| SpecificationItem.specification | SpecificationItem → Specification | N:1 |
|
||||
| Resource.invoice | Resource → Invoice | N:1 |
|
||||
| Resource.specification | Resource → Specification | N:1 (nullable) |
|
||||
| Resource.module | Resource → Module | N:1 |
|
||||
| ResourceAllocation.resource | ResourceAllocation → Resource | N:1 |
|
||||
|
||||
### 2.3 Constraints
|
||||
|
||||
**PurchaseSpecification:**
|
||||
- PK: (purchase_id, specification_id)
|
||||
- FK: purchase_id → Purchase.id (CASCADE)
|
||||
- FK: specification_id → Specification.id (CASCADE)
|
||||
|
||||
**PurchaseItem:**
|
||||
- FK: purchase_id → Purchase.id (CASCADE)
|
||||
- FK: module_id → Module.id (RESTRICT)
|
||||
|
||||
**Resource:**
|
||||
- FK: project_id → Project.id (CASCADE)
|
||||
- FK: module_id → Module.id (RESTRICT)
|
||||
- FK: invoice_id → Invoice.id (SET NULL)
|
||||
- FK: specification_id → Specification.id (SET NULL)
|
||||
- Check: quantity > 0
|
||||
|
||||
---
|
||||
|
||||
## 3. Real Procurement Scenarios
|
||||
|
||||
### 3.1 Сценарий A — одна закупка, одна спецификация
|
||||
|
||||
```
|
||||
Purchase #1
|
||||
└─ Specification #18
|
||||
└─ Invoice #145
|
||||
└─ Resource: Camera ×2000
|
||||
```
|
||||
|
||||
**Реализация:** ✅ Поддерживается
|
||||
- Purchase → Specification через PurchaseSpecification
|
||||
- Invoice → Purchase
|
||||
- Resource → Invoice + Resource → Specification
|
||||
|
||||
### 3.2 Сценарий B — одна закупка, несколько спецификаций
|
||||
|
||||
```
|
||||
Purchase #1
|
||||
├─ Specification #18
|
||||
└─ Specification #27
|
||||
```
|
||||
|
||||
**Реализация:** ✅ Поддерживается
|
||||
- M:N связь Purchase ↔ Specification через PurchaseSpecification
|
||||
- Одна запись Purchase может иметь много записей PurchaseSpecification
|
||||
|
||||
### 3.3 Сценарий C — одна закупка, несколько Invoice
|
||||
|
||||
```
|
||||
Purchase #1
|
||||
├─ Invoice #145
|
||||
└─ Invoice #146
|
||||
```
|
||||
|
||||
**Реализация:** ✅ Поддерживается
|
||||
- Invoice → Purchase (N:1)
|
||||
- Одна Purchase может иметь много Invoice
|
||||
|
||||
### 3.4 Сценарий D — один Invoice, несколько Resource
|
||||
|
||||
```
|
||||
Invoice #145
|
||||
├─ Camera ×2000
|
||||
├─ Agent ×100
|
||||
└─ Tracker ×50
|
||||
```
|
||||
|
||||
**Реализация:** ✅ Поддерживается
|
||||
- Resource → Invoice (N:1)
|
||||
- Одна Invoice может быть источником многих Resource
|
||||
|
||||
### 3.5 Сценарий E — один Module из нескольких закупок
|
||||
|
||||
```
|
||||
Camera:
|
||||
Resource #1 → Invoice #101 → Spec #12 → ×1000
|
||||
Resource #2 → Invoice #145 → Spec #18 → ×2000
|
||||
Resource #3 → Invoice #201 → Spec #27 → ×2000
|
||||
```
|
||||
|
||||
**Реализация:** ✅ Поддерживается
|
||||
- Каждый Resource имеет независимый ID
|
||||
- Provenance сохраняется для каждого Resource
|
||||
|
||||
### 3.6 Сценарий F — один Resource распределяется в несколько систем
|
||||
|
||||
```
|
||||
Resource Camera ×2000
|
||||
├─ System A / Guardian 1 → ×300
|
||||
├─ System B / Guardian 2 → ×700
|
||||
└─ System B / Common → ×400
|
||||
|
||||
remaining = 600
|
||||
```
|
||||
|
||||
**Реализация:** ✅ Поддерживается (уже реализовано в 004)
|
||||
- ResourceAllocation → Resource (N:1)
|
||||
- Остаток рассчитывается как `Resource.quantity - SUM(ResourceAllocation.quantity)`
|
||||
|
||||
---
|
||||
|
||||
## 4. PurchaseItem vs Resource
|
||||
|
||||
### 4.1 PurchaseItem семантика
|
||||
|
||||
**Purpose:** Позиция в закупке (ordered quantity)
|
||||
|
||||
```
|
||||
PurchaseItem
|
||||
├─ Module = Camera
|
||||
├─ Ordered quantity = 2000
|
||||
├─ Unit price = $100.00
|
||||
└─ Description = "License modules"
|
||||
```
|
||||
|
||||
**Характеристики:**
|
||||
- Представляет **обязательство** закупить Module
|
||||
- Количество — **заказанное** (ordered)
|
||||
- Цена — **ценовое обязательство** (unit_price)
|
||||
- Не изменяется после создания (историческая запись)
|
||||
|
||||
### 4.2 Resource семантика
|
||||
|
||||
**Purpose:** Фактически полученная партия (received quantity)
|
||||
|
||||
```
|
||||
Resource
|
||||
├─ Module = Camera
|
||||
├─ Received quantity = 2000
|
||||
├─ Invoice = #145
|
||||
├─ Specification = #18
|
||||
└─ Invoice date = 2026-10-07
|
||||
```
|
||||
|
||||
**Характеристики:**
|
||||
- Представляет **фактическое поступление** Module
|
||||
- Количество — **полученное** (received)
|
||||
- Связан с Invoice и Specification
|
||||
- Может быть распределён в Systems
|
||||
|
||||
### 4.3 Ключевое различие
|
||||
|
||||
| Аспект | PurchaseItem | Resource |
|
||||
|--------|--------------|----------|
|
||||
| **Nature** | Ordered / Agreed | Received / Actual |
|
||||
| **Quantity** | Заказано | Поступило |
|
||||
| **Price** | unit_price | Не хранит цену |
|
||||
| **Immutability** | Историческая запись | Меняется (allocation) |
|
||||
| **Provenance** | Purchase | Invoice + Specification |
|
||||
|
||||
### 4.4 Decision: Resource → PurchaseItem связь
|
||||
|
||||
**Вариант A (без прямой связи):**
|
||||
```
|
||||
Resource
|
||||
├─ Invoice → Purchase → PurchaseItem
|
||||
└─ Specification
|
||||
```
|
||||
|
||||
**Вариант B (с прямой связью):**
|
||||
```
|
||||
Resource
|
||||
├─ Invoice → Purchase
|
||||
├─ Specification
|
||||
└─ PurchaseItem (FK)
|
||||
```
|
||||
|
||||
**Decision:** **Вариант A** (без прямой связи)
|
||||
|
||||
**Reason:**
|
||||
1. Provenance цепочка через Invoice достаточно однозначна
|
||||
2. Resource → Specification (опционально) уже связывает с SpecificationItem
|
||||
3. Добавление FK увеличит сложность без существенной выгоды
|
||||
4. Можно найти PurchaseItem через:
|
||||
- `Invoice.purchase_id → Purchase.purchase_id`
|
||||
- `Purchase.purchase_id → PurchaseItem.purchase_id`
|
||||
- Фильтрация по `module_id`
|
||||
|
||||
**Current model impact:**
|
||||
- Никаких изменений в модели
|
||||
- Никаких миграций не требуется
|
||||
|
||||
---
|
||||
|
||||
## 5. Invoice Semantics
|
||||
|
||||
### 5.1 Текущая модель
|
||||
|
||||
```
|
||||
Invoice
|
||||
├─ purchase_id (FK → Purchase)
|
||||
├─ vendor_id (FK → Vendor)
|
||||
├─ invoice_number
|
||||
├─ invoice_date
|
||||
├─ amount (Numeric)
|
||||
└─ description (Text)
|
||||
```
|
||||
|
||||
### 5.2 Проверяемые вопросы
|
||||
|
||||
| Вопрос | Ответ | Обоснование |
|
||||
|--------|-------|-------------|
|
||||
| Invoice относится к Purchase? | ✅ Да | `purchase_id` FK |
|
||||
| Один Purchase может иметь несколько Invoice? | ✅ Да | N:1 (N Invoice → 1 Purchase) |
|
||||
| Один Invoice может содержать несколько PurchaseItem? | ❌ Нет | Invoice не имеет прямой связи с PurchaseItem |
|
||||
| Один Invoice может порождать несколько Resource? | ✅ Да | N:1 (N Resource → 1 Invoice) |
|
||||
| Как определяется Project Invoice? | Через Purchase | `Invoice → Purchase → Project` |
|
||||
|
||||
### 5.3 Invoice ↔ Project связь
|
||||
|
||||
**Факт:** Invoice не имеет direct `project_id`
|
||||
|
||||
**Provenance:**
|
||||
```
|
||||
Resource → Invoice → Purchase → Project
|
||||
```
|
||||
|
||||
**Decision:** Текущей косвенной связи **достаточно**
|
||||
|
||||
**Reason:**
|
||||
1. Purchase имеет `project_id` — это определяет Project закупки
|
||||
2. Invoice не может принадлежать к другому Project, чем Purchase
|
||||
3. Прямой `project_id` у Invoice избыточен (нарушает нормальную форму)
|
||||
4. Все проверки через Purchase работают корректно
|
||||
|
||||
**Gap:** Проверка Invoice ↔ Project требует JOIN через Purchase
|
||||
```sql
|
||||
SELECT * FROM Invoice
|
||||
JOIN Purchase ON Invoice.purchase_id = Purchase.id
|
||||
WHERE Purchase.project_id = ?
|
||||
```
|
||||
|
||||
**Рекомендация:** Добавить `project_id` к Invoice для оптимизации
|
||||
- **NOT в рамках 006** — отдельная архитектурная задача
|
||||
|
||||
---
|
||||
|
||||
## 6. Specification Semantics
|
||||
|
||||
### 6.1 Текущая модель
|
||||
|
||||
```
|
||||
Specification
|
||||
├─ project_id (FK → Project)
|
||||
├─ contract_id (FK → Contract)
|
||||
├─ specification_number
|
||||
├─ specification_date
|
||||
└─ specifications (M:N → Purchase через PurchaseSpecification)
|
||||
|
||||
SpecificationItem
|
||||
├─ specification_id (FK → Specification)
|
||||
├─ module_id (FK → Module)
|
||||
├─ quantity
|
||||
└─ description
|
||||
|
||||
PurchaseSpecification
|
||||
├─ purchase_id (PK, FK → Purchase)
|
||||
└─ specification_id (PK, FK → Specification)
|
||||
```
|
||||
|
||||
### 6.2 Проверяемые вопросы
|
||||
|
||||
| Вопрос | Ответ | Обоснование |
|
||||
|--------|-------|-------------|
|
||||
| Specification принадлежит Project? | ✅ Да | `project_id` FK |
|
||||
| Purchase может быть связан с несколькими Specification? | ✅ Да | M:N через PurchaseSpecification |
|
||||
| Resource может ссылаться на Specification напрямую? | ✅ Да | `specification_id` nullable FK |
|
||||
| Если Purchase связан с несколькими Specification, как однозначно определить Specification конкретного Resource/Invoice? | ⚠️ **Ambiguous** | Resource → Specification (опционально) |
|
||||
| Может ли один Invoice содержать ресурсы для нескольких Specification? | ⚠️ **Неясно** | Resource → Invoice (N:1), Resource → Specification (N:1 nullable) |
|
||||
|
||||
### 6.3 Critical Ambiguity
|
||||
|
||||
**Проблема:** Если Purchase имеет несколько Specification:
|
||||
|
||||
```
|
||||
Purchase #10
|
||||
├─ Spec #18
|
||||
└─ Spec #27
|
||||
|
||||
Invoice #145
|
||||
├─ Camera ×1000 → Spec #18 (через Resource.specification_id)
|
||||
└─ Camera ×500 → Spec #27 (через Resource.specification_id)
|
||||
```
|
||||
|
||||
**Вопрос:** Как однозначно определить, к какой Specification относится Resource?
|
||||
|
||||
**Текущий механизм:** Resource.specification_id
|
||||
|
||||
**Проблема:**
|
||||
- `specification_id` в Resource **опционально** (nullable)
|
||||
- Нет механизма принудительного указания Specification
|
||||
- Если `specification_id` NULL, происхождение неясно
|
||||
|
||||
**Decision:** Текущая модель **допускает неоднозначность**
|
||||
|
||||
**Reason:**
|
||||
1. Specification опциональна для Resource
|
||||
2. Нет проверки на уровне модели
|
||||
3. Проверка должна быть в Service layer
|
||||
|
||||
**Gap:** Нет явного механизма для случаев, когда Purchase имеет несколько Specification
|
||||
|
||||
**Рекомендация:** Сделать `specification_id` **обязательным** или добавить `InvoiceSpecification` ассоциацию
|
||||
|
||||
---
|
||||
|
||||
## 7. Provenance Chain
|
||||
|
||||
### 7.1 Окончательная цепочка
|
||||
|
||||
```
|
||||
Specification (customer need)
|
||||
↓
|
||||
PurchaseSpecification (link)
|
||||
↓
|
||||
Purchase (procurement action)
|
||||
↓
|
||||
PurchaseItem (ordered module)
|
||||
↓
|
||||
Invoice (payment document)
|
||||
↓
|
||||
Resource (received module)
|
||||
↓
|
||||
ResourceAllocation (distribution)
|
||||
↓
|
||||
System / Guardian / Common (usage)
|
||||
```
|
||||
|
||||
### 7.2 Каждый шаг
|
||||
|
||||
| Шаг | Entity | Purpose | FK Links |
|
||||
|-----|--------|---------|----------|
|
||||
| 1 | Specification | Потребность заказчика | project_id, contract_id |
|
||||
| 2 | PurchaseSpecification | Связь Purchase ↔ Specification | purchase_id, specification_id |
|
||||
| 3 | Purchase | Закупка у поставщика | project_id, vendor_id |
|
||||
| 4 | PurchaseItem | Позиция в закупке | purchase_id, module_id |
|
||||
| 5 | Invoice | Счёт поставщика | purchase_id, vendor_id |
|
||||
| 6 | Resource | Фактически полученная партия | project_id, module_id, invoice_id, specification_id |
|
||||
| 7 | ResourceAllocation | Распределение в системы | resource_id, system_id, guardian_id |
|
||||
| 8 | System/Guardian/Common | Использование | - |
|
||||
|
||||
### 7.3 Инварианты
|
||||
|
||||
1. **Resource всегда относится к Project** ✅ enforced через `project_id` FK
|
||||
2. **Resource всегда относится к Module** ✅ enforced через `module_id` FK
|
||||
3. **Resource всегда относится к Invoice** ✅ enforced через `invoice_id` FK
|
||||
4. **Specification у Resource либо отсутствует, либо относится к тому же Project** ⚠️ **проверка в Service**
|
||||
5. **Resource quantity > 0** ✅ enforced через CheckConstraint
|
||||
6. **Resource не должен смешивать разные Invoice/Specification** ✅ enforced через FK
|
||||
7. **Один Invoice может породить много Resource** ✅ enforced через N:1
|
||||
8. **Один Module может иметь много Resource** ✅ enforced через N:1
|
||||
9. **Один Resource может иметь много ResourceAllocation** ✅ enforced через N:1
|
||||
10. **Сумма ResourceAllocation не может превышать Resource.quantity** ✅ enforced в Service
|
||||
|
||||
---
|
||||
|
||||
## 8. Decision Log
|
||||
|
||||
### 8.1 Decision: Resource → PurchaseItem
|
||||
|
||||
| Attribute | Value |
|
||||
|-----------|-------|
|
||||
| **Decision** | Без прямой FK связи (Вариант A) |
|
||||
| **Reason** | Провенанс через Invoice → Purchase → PurchaseItem однозначен |
|
||||
| **Current model impact** | Никаких изменений |
|
||||
|
||||
### 8.2 Decision: InvoiceSemantics
|
||||
|
||||
| Attribute | Value |
|
||||
|-----------|-------|
|
||||
| **Decision** | Текущей косвенной связи достаточно |
|
||||
| **Reason** | Invoice → Purchase → Project работает корректно |
|
||||
| **Current model impact** | Никаких изменений |
|
||||
|
||||
### 8.3 Decision: InvoiceItem
|
||||
|
||||
| Attribute | Value |
|
||||
|-----------|-------|
|
||||
| **Decision** | **Не создавать** InvoiceItem |
|
||||
| **Reason** | Текущая модель PurchaseItem/Invoice/Resource достаточно для всех сценариев |
|
||||
| **Current model impact** | Никаких изменений |
|
||||
|
||||
### 8.4 Decision: Specification Ambiguity
|
||||
|
||||
| Attribute | Value |
|
||||
|-----------|-------|
|
||||
| **Decision** | Оставить nullable specification_id |
|
||||
| **Reason** | Некоторые Resource могут быть общими для нескольких Specification |
|
||||
| **Current model impact** | Никаких изменений, но Service layer должен проверять Project match |
|
||||
|
||||
---
|
||||
|
||||
## 9. Business Invariants
|
||||
|
||||
### 9.1 Enforced by Database
|
||||
|
||||
| # | Invariant | Enforcement |
|
||||
|---|-----------|-------------|
|
||||
| 1 | Resource.project_id > 0 | NOT NULL FK |
|
||||
| 2 | Resource.quantity > 0 | CheckConstraint |
|
||||
| 3 | ResourceAllocation.quantity > 0 | CheckConstraint |
|
||||
| 4 | PurchaseSpecification уникальность | PK (purchase_id, specification_id) |
|
||||
| 5 | PurchaseItem уникальность | PK (purchase_item_id) |
|
||||
|
||||
### 9.2 Enforced by Service Layer
|
||||
|
||||
| # | Invariant | Enforcement |
|
||||
|---|-----------|-------------|
|
||||
| 1 | Specification принадлежит тому же Project | `specification.project_id == project_id` |
|
||||
| 2 | Invoice принадлежит тому же Project | `Invoice.purchase.project_id == project_id` |
|
||||
| 3 | Resource.quantity не превышает остаток | `SUM(allocations) + quantity <= resource.quantity` |
|
||||
| 4 | Module существует | Query Module before use |
|
||||
|
||||
---
|
||||
|
||||
## 10. Gaps & Follow-up
|
||||
|
||||
### 10.1 Gap 1: Invoice → Project indirect link
|
||||
|
||||
**Problem:** Invoice не имеет direct `project_id`
|
||||
|
||||
**Impact:** Проверка требует JOIN через Purchase
|
||||
|
||||
**Recommendation:** Добавить `project_id` к Invoice
|
||||
- **NOT в рамках 006** — отдельная архитектурная задача
|
||||
- **Risk:** Нарушение нормализации (дублирование Project reference)
|
||||
|
||||
### 10.2 Gap 2: Specification ambiguity
|
||||
|
||||
**Problem:** Если Purchase имеет несколько Specification, ambiguous определить Specification конкретного Resource
|
||||
|
||||
**Impact:** Resource без `specification_id` имеет неясное происхождение
|
||||
|
||||
**Recommendation:**
|
||||
- Вариант A: Сделать `specification_id` обязательным для Resource
|
||||
- Вариант B: Добавить `InvoiceSpecification` ассоциация
|
||||
|
||||
### 10.3 Gap 3: Purchase vs Resource quantity
|
||||
|
||||
**Problem:** Нет явного distinction между ordered и received quantity
|
||||
|
||||
**Impact:**
|
||||
- `PurchaseItem.quantity` — ordered
|
||||
- `Resource.quantity` — received
|
||||
- Нет проверки `received <= ordered`
|
||||
|
||||
**Recommendation:** Добавить constraint в Service layer
|
||||
- Проверять `Resource.quantity <= SUM(PurchaseItem.quantity)`
|
||||
|
||||
### 10.4 Gap 4: Partial delivery
|
||||
|
||||
**Problem:** Нет поддержки частичных поставок
|
||||
|
||||
**Impact:**
|
||||
- Заказано 2000, получено 1800
|
||||
- Нет механизма "оставшиеся 200"
|
||||
|
||||
**Recommendation:**
|
||||
- Добавить `received_quantity` к PurchaseItem
|
||||
- Или использовать Resource для каждой частичной поставки
|
||||
|
||||
---
|
||||
|
||||
## 11. Recommended Next Implementation Task
|
||||
|
||||
### 11.1 Task: 007-ProvenanceValidationService
|
||||
|
||||
**Title:** Service layer validation для procurement provenance
|
||||
|
||||
**Scope:**
|
||||
1. Service `ProvenanceValidationService`
|
||||
2. Проверка Specification ↔ Project match
|
||||
3. Проверка Invoice ↔ Project match (через Purchase)
|
||||
4. Проверка ordered vs received quantity
|
||||
5. Проверка частичных поставок (optional)
|
||||
|
||||
**Files to create:**
|
||||
- `app/services/provenance_validation_service.py`
|
||||
- `tests/test_provenance_validation.py`
|
||||
|
||||
**Files to modify:**
|
||||
- `ResourceReceiptService.receive_resource()` — добавить validation
|
||||
- `ResourceAllocationService.allocate_resource()` — добавить validation
|
||||
|
||||
**Estimated effort:** 1-2 дня
|
||||
|
||||
### 11.2 Alternative Task: 007-ProvenanceQueryService
|
||||
|
||||
**Title:** Service для query procurement provenance chain
|
||||
|
||||
**Scope:**
|
||||
1. Service `ProvenanceQueryService`
|
||||
2. Метод `get_provenance_chain(resource_id)`
|
||||
3. Метод `get_ordered_received_allocated_quantities(resource_id)`
|
||||
4. Метод `get_purchases_by_specification(specification_id)`
|
||||
|
||||
**Files to create:**
|
||||
- `app/services/provenance_query_service.py`
|
||||
- `tests/test_provenance_query.py`
|
||||
|
||||
**Files to modify:**
|
||||
- Никаких изменений в existing services
|
||||
|
||||
**Estimated effort:** 1 день
|
||||
|
||||
---
|
||||
|
||||
## 12. Summary
|
||||
|
||||
### 12.1 Фактические модели
|
||||
|
||||
- **Purchase/PurchaseItem/PurchaseSpecification** — procurement (ordered)
|
||||
- **Invoice** — payment document
|
||||
- **Resource** — received module
|
||||
- **ResourceAllocation** — distribution
|
||||
|
||||
### 12.2 Фактические связи
|
||||
|
||||
- **Purchase ↔ Specification** — M:N через PurchaseSpecification
|
||||
- **Invoice → Purchase** — N:1
|
||||
- **Resource → Invoice** — N:1
|
||||
- **Resource → Specification** — N:1 (nullable)
|
||||
- **ResourceAllocation → Resource** — N:1
|
||||
|
||||
### 12.3 Реальные сценарии
|
||||
|
||||
- **A-F** — все поддерживаются текущей моделью
|
||||
- **F** — уже реализовано в 004
|
||||
|
||||
### 12.4 PurchaseItem vs Resource
|
||||
|
||||
- **PurchaseItem** — ordered quantity (обязательство)
|
||||
- **Resource** — received quantity (фактическое поступление)
|
||||
- **Decision** — без прямой FK связи (Вариант A)
|
||||
|
||||
### 12.5 Invoice Semantics
|
||||
|
||||
- **Invoice → Purchase** — N:1
|
||||
- **Purchase → Project** — 1:1
|
||||
- **Invoice → Project** — косвенно через Purchase
|
||||
- **Decision** — косвенной связи достаточно
|
||||
|
||||
### 12.6 Specification Semantics
|
||||
|
||||
- **Specification → Project** — прямая FK
|
||||
- **Purchase ↔ Specification** — M:N
|
||||
- **Resource → Specification** — nullable FK
|
||||
- **Decision** — nullable спецификация необходима для общих Resource
|
||||
|
||||
### 12.7 Provenance Chain
|
||||
|
||||
```
|
||||
Specification → PurchaseSpecification → Purchase → PurchaseItem → Invoice → Resource → ResourceAllocation → System/Guardian/Common
|
||||
```
|
||||
|
||||
### 12.8 Gaps
|
||||
|
||||
1. **Invoice → Project indirect link** — требует JOIN
|
||||
2. **Specification ambiguity** — nullable specification_id
|
||||
3. **Purchase vs Resource quantity** — нет проверки ordered/received
|
||||
4. **Partial delivery** — нет поддержки частичных поставок
|
||||
|
||||
### 12.9 Recommended Task
|
||||
|
||||
**007-ProvenanceValidationService** — Service layer validation для procurement provenance
|
||||
|
||||
---
|
||||
|
||||
**Design завершен. Переход к следующей задаче НЕ производится.**
|
||||
File diff suppressed because it is too large
Load Diff
@@ -0,0 +1,626 @@
|
||||
# Procurement Flow Domain Review v1
|
||||
|
||||
## 1. Executive Summary
|
||||
|
||||
**Задача:** 009-procurement-flow-domain-review-v1
|
||||
**Дата:** 07 October 2026
|
||||
**Рабочая директория:** `/mnt/nas/hermes-test/Specs`
|
||||
|
||||
**Тип:** Architecture / Domain Review (ТОЛЬКО обзор, без изменений кода)
|
||||
|
||||
**Цель:** Провести архитектурный gate после `008-procurement-flow-design-v2` — проверить корректность модели закупочного контура на уровне бизнес-семантики перед реализацией.
|
||||
|
||||
**Результат:** **PASS WITH CHANGES**
|
||||
|
||||
---
|
||||
|
||||
## 2. Findings Summary
|
||||
|
||||
### Finding 1: Module-level quantity validation
|
||||
|
||||
**Problem:** Текущая модель позволяет проверить `SUM(Resource.quantity) <= SUM(PurchaseItem.quantity)` только на уровне всей Purchase, а не по Module.
|
||||
|
||||
**Scenario:**
|
||||
```
|
||||
Purchase #10
|
||||
PurchaseItem: Camera × 100
|
||||
PurchaseItem: Agent × 100
|
||||
|
||||
Resource:
|
||||
Camera × 200
|
||||
```
|
||||
|
||||
**Analysis:**
|
||||
- Общий `SUM(PurchaseItem.quantity) = 200`
|
||||
- Общий `SUM(Resource.quantity) = 200`
|
||||
- Проверка на уровне суммы проходит ✅
|
||||
- Но по Module: `Camera: 200 received > 100 ordered` ❌
|
||||
|
||||
**Decision:** Проверка ordered vs received должна выполняться **по Module**, не по общей сумме.
|
||||
|
||||
**Impact:** Service layer должен выполнять модульную проверку.
|
||||
|
||||
---
|
||||
|
||||
### Finding 2: Resource.specification_id семантика
|
||||
|
||||
**Problem:** Неоднозначность: `Resource.specification_id` означает "партия относится к Specification" или "закрывает конкретную SpecificationItem"?
|
||||
|
||||
**Analysis:**
|
||||
- Текущая модель связывает Resource с Specification на уровне Specification, не Item
|
||||
- `SpecificationItem.quantity` — потребность, но проверка не выполняется на уровне Item
|
||||
- Service layer валидирует Project match, но не Item-level fulfillment
|
||||
|
||||
**Decision:** `Resource.specification_id` означает **"эта полученная партия относится к Specification"** (provenance на уровне Specification), а не "закрывает конкретную SpecificationItem".
|
||||
|
||||
**Impact:** Service layer должен проверять `SUM(Resource.quantity) <= SpecificationItem.quantity` по Module.
|
||||
|
||||
---
|
||||
|
||||
### Finding 3: Purchase → Specification → Resource связь
|
||||
|
||||
**Problem:** Может ли Resource указывать Specification, которая не связана с его Purchase?
|
||||
|
||||
**Scenario:**
|
||||
```
|
||||
Purchase #10
|
||||
PurchaseSpecification → Spec #12, Spec #18
|
||||
|
||||
Resource
|
||||
Invoice → Purchase #10
|
||||
Specification → Spec #999
|
||||
```
|
||||
где `Spec #999` принадлежит тому же Project, но не связана с Purchase #10.
|
||||
|
||||
**Analysis:**
|
||||
- Текущая модель позволяет любую Specification из того же Project
|
||||
- Это нарушает business rule: Resource должен относиться к Specification, связанной с Purchase
|
||||
|
||||
**Decision:** **Resource.specification_id должен быть связан с Purchase через PurchaseSpecification.**
|
||||
|
||||
**Impact:** Service layer должен проверять, что `Specification.id` находится в `Purchase.specifications`.
|
||||
|
||||
---
|
||||
|
||||
### Finding 4: Resource.semantics — Delivery vs Resource
|
||||
|
||||
**Problem:** Достаточно ли текущего `Resource` для частичных поставок, или нужна отдельная сущность `Delivery`?
|
||||
|
||||
**Analysis:**
|
||||
- `Resource` = полученная партия (batch)
|
||||
- `Delivery` = событие/документ поставки
|
||||
- Частичная поставка: один Purchase → несколько поставок → несколько Resources
|
||||
|
||||
**Decision:** **Не создавать Delivery в рамках v1.**
|
||||
|
||||
**Reason:**
|
||||
1. `Resource` уже хранит факт поступления (invoice, date, quantity)
|
||||
2. `Invoice` может быть разделен на несколько `Resource`
|
||||
3. `Shipment` существующая сущность для отгрузок
|
||||
|
||||
**Follow-up:** Рассмотреть `Delivery` для future enhancement если потребуется tracking отдельных событий поставки.
|
||||
|
||||
---
|
||||
|
||||
### Finding 5: Resource.invoice_id обязательность
|
||||
|
||||
**Problem:** Может ли Resource существовать без Invoice?
|
||||
|
||||
**Analysis:**
|
||||
- Текущая модель: `invoice_id` nullable
|
||||
- Business rule: Resource должен сохранять provenance до Invoice
|
||||
|
||||
**Decision:** **invoice_id должен быть NOT NULL.**
|
||||
|
||||
**Reason:**
|
||||
1. Invoice — источник факта получения ресурса
|
||||
2. Без Invoice невозможно проверить provenance
|
||||
3. Business rule нарушается если Resource без Invoice
|
||||
|
||||
**Impact:** Изменить модель: `invoice_id` NOT NULL.
|
||||
|
||||
---
|
||||
|
||||
### Finding 6: Module mismatch в Resource
|
||||
|
||||
**Problem:** Допустим ли Resource с Module, которого нет в Specification?
|
||||
|
||||
**Scenario:**
|
||||
```
|
||||
Specification #12
|
||||
Camera × 1000
|
||||
|
||||
Resource
|
||||
Agent × 10
|
||||
Specification = #12
|
||||
```
|
||||
|
||||
**Analysis:**
|
||||
- Resource имеет Module (Agent), которого нет в Specification
|
||||
- Это нарушает business rule: Resource должен относиться к модулям Specification
|
||||
|
||||
**Decision:** **Resource.module_id должен быть в SpecificationItem.specification_id, module_id.**
|
||||
|
||||
**Impact:** Service layer должен проверять наличие Module в Specification.
|
||||
|
||||
---
|
||||
|
||||
### Finding 7: Multiple PurchaseItem одного Module
|
||||
|
||||
**Problem:** Разрешена ли модель с дублированием `(purchase_id, module_id)`?
|
||||
|
||||
**Scenario:**
|
||||
```
|
||||
Purchase #10
|
||||
PurchaseItem: Camera × 1000
|
||||
PurchaseItem: Camera × 500
|
||||
```
|
||||
|
||||
**Analysis:**
|
||||
- Текущая модель разрешает дублирование (нет UNIQUE constraint)
|
||||
- Неясно, как сопоставлять Resource с ordered quantity
|
||||
|
||||
**Decision:** **Дублирование `(purchase_id, module_id)` должно быть запрещено на уровне DB.**
|
||||
|
||||
**Reason:**
|
||||
1. Одна закупка → один заказанный quantity по Module
|
||||
2. Дублирование создает неоднозначность
|
||||
3. Service layer не может однозначно сопоставить Resource
|
||||
|
||||
**Impact:** Добавить UNIQUE constraint на `(purchase_id, module_id)`.
|
||||
|
||||
---
|
||||
|
||||
### Finding 8: Invoice как financial document
|
||||
|
||||
**Problem:** Не противоречит ли обязательность Invoice тому, что Invoice — financial document?
|
||||
|
||||
**Analysis:**
|
||||
- Invoice хранит `amount` (financial sum)
|
||||
- Resource хранит `quantity` (received amount)
|
||||
- Нет явной связи quantity ↔ amount
|
||||
|
||||
**Decision:** **Invoice может быть только financial document, quantity через Resource.**
|
||||
|
||||
**Reason:**
|
||||
1. `Invoice.amount` — сумма к оплате
|
||||
2. `Resource.quantity` — полученное количество
|
||||
3. Нет прямого соотношения quantity ↔ price
|
||||
|
||||
**Impact:** Никаких изменений, текущая модель корректна.
|
||||
|
||||
---
|
||||
|
||||
## 3. Quantity Validation — Module-level checks
|
||||
|
||||
### 3.1 Ordered vs Received per Module
|
||||
|
||||
**Business Rule:** Количество полученного ресурса по каждому Module не может превышать заказанное.
|
||||
|
||||
**Current Model:**
|
||||
- `PurchaseItem.quantity` — ordered per Module per Purchase
|
||||
- `Resource.quantity` — received per batch
|
||||
|
||||
**Validation Required:**
|
||||
```python
|
||||
# Для каждого Module в Purchase:
|
||||
ordered = SUM(PurchaseItem.quantity)
|
||||
received = SUM(Resource.quantity)
|
||||
WHERE PurchaseItem.module_id = Module.id
|
||||
AND Resource.module_id = Module.id
|
||||
AND Resource.invoice.purchase = Purchase
|
||||
|
||||
assert received <= ordered
|
||||
```
|
||||
|
||||
**Decision:** Проверка **обязательна по Module**, не по общей сумме.
|
||||
|
||||
**Impact:** Service layer должен выполнять модульную проверку.
|
||||
|
||||
---
|
||||
|
||||
### 3.2 Over-fulfillment of SpecificationItem
|
||||
|
||||
**Business Rule:** Количество ресурса, относящегося к SpecificationItem, не может превышать потребность.
|
||||
|
||||
**Scenario:**
|
||||
```
|
||||
SpecificationItem
|
||||
Camera × 1000
|
||||
|
||||
Resource
|
||||
Camera × 1200
|
||||
Specification = #12
|
||||
```
|
||||
|
||||
**Analysis:**
|
||||
- `SpecificationItem.quantity` — потребность заказчика
|
||||
- `Resource.quantity` — фактическое получение
|
||||
- Over-fulfillment = `received > need`
|
||||
|
||||
**Decision:** **Service layer должен проверять `SUM(Resource.quantity) <= SpecificationItem.quantity` по Module.**
|
||||
|
||||
**Follow-up:** Бизнес-правило over-fulfillment (разрешено или запрещено?) должно быть определено.
|
||||
|
||||
**Impact:** Добавить проверку в ProvenanceValidationService.
|
||||
|
||||
---
|
||||
|
||||
## 4. Specification Provenance — Resource.specification_id
|
||||
|
||||
### 4.1 Точная семантика
|
||||
|
||||
**Question:** `Resource.specification_id` означает "партия относится к Specification" или "закрывает конкретную SpecificationItem"?
|
||||
|
||||
**Answer:** **Относится к Specification** (на уровне Specification, не Item).
|
||||
|
||||
**Reason:**
|
||||
1. `Specification` хранит потребность (need)
|
||||
2. `SpecificationItem` хранит потребность по Module
|
||||
3. Resource связывается с Specification, не с Item
|
||||
|
||||
**Decision:** `Resource.specification_id` = provenance на уровне Specification.
|
||||
|
||||
**Impact:** Service layer должен проверять Module-level fulfillment через JOIN к SpecificationItem.
|
||||
|
||||
---
|
||||
|
||||
### 4.2 Resource → SpecificationItem связь
|
||||
|
||||
**Question:** Нужна ли прямая FK `Resource.specification_item_id`?
|
||||
|
||||
**Analysis:**
|
||||
- Текущая модель: Resource → Specification (nullable)
|
||||
- Проверка через JOIN: `Resource.module_id = SpecificationItem.module_id`
|
||||
|
||||
**Decision:** **Не создавать прямую FK.**
|
||||
|
||||
**Reason:**
|
||||
1. Один Module может быть в нескольких SpecificationItem (редко, но возможно)
|
||||
2. JOIN достаточно для проверки
|
||||
3. Не усложнять модель без реальной необходимости
|
||||
|
||||
**Impact:** Service layer выполняет JOIN для проверки.
|
||||
|
||||
---
|
||||
|
||||
## 5. Resource Semantics — Delivery vs Resource
|
||||
|
||||
### 5.1 Resource как партия
|
||||
|
||||
**Decision:** `Resource = полученная партия (batch)`.
|
||||
|
||||
**Reason:**
|
||||
1. Историческая запись о факте поступления
|
||||
2. Сохраняет provenance: Invoice, Specification, Module, quantity
|
||||
3. Не хранит остаток (вычисляется)
|
||||
|
||||
**Impact:** Текущая модель корректна.
|
||||
|
||||
---
|
||||
|
||||
### 5.2 Delivery как отдельный документ
|
||||
|
||||
**Question:** Нужна ли сущность Delivery?
|
||||
|
||||
**Analysis:**
|
||||
- `Delivery` = событие/документ поставки
|
||||
- `Shipment` уже существует (отгрузка)
|
||||
- `Resource` хранит факт получения
|
||||
|
||||
**Decision:** **Не создавать Delivery в рамках v1.**
|
||||
|
||||
**Reason:**
|
||||
1. `Resource` уже хранит факт получения (invoice, date, quantity)
|
||||
2. `Shipment` может использоваться для отгрузок
|
||||
3. Дополнительная сущность избыточна
|
||||
|
||||
**Follow-up:** Если потребуется tracking отдельных событий поставки — рассмотреть `Delivery` в future.
|
||||
|
||||
**Impact:** Никаких изменений.
|
||||
|
||||
---
|
||||
|
||||
## 6. Invoice и Resource
|
||||
|
||||
### 6.1 Обязательность invoice_id
|
||||
|
||||
**Question:** Может ли Resource существовать без Invoice?
|
||||
|
||||
**Decision:** **invoice_id должен быть NOT NULL.**
|
||||
|
||||
**Reason:**
|
||||
1. Invoice — источник факта получения ресурса
|
||||
2. Без Invoice невозможно проверить provenance
|
||||
3. Business rule нарушается если Resource без Invoice
|
||||
|
||||
**Impact:** Изменить модель: `invoice_id` NOT NULL.
|
||||
|
||||
---
|
||||
|
||||
### 6.2 Invoice как financial document
|
||||
|
||||
**Decision:** Invoice может быть только financial document.
|
||||
|
||||
**Reason:**
|
||||
1. `Invoice.amount` — сумма к оплате
|
||||
2. `Resource.quantity` — полученное количество
|
||||
3. Нет прямого соотношения
|
||||
|
||||
**Impact:** Текущая модель корректна.
|
||||
|
||||
---
|
||||
|
||||
## 7. Multiple PurchaseItem одного Module
|
||||
|
||||
### 7.1 Дублирование (purchase_id, module_id)
|
||||
|
||||
**Question:** Разрешено ли дублирование?
|
||||
|
||||
**Decision:** **Дублирование запрещено.**
|
||||
|
||||
**Reason:**
|
||||
1. Одна закупка → один заказанный quantity по Module
|
||||
2. Дублирование создает неоднозначность
|
||||
3. Service layer не может однозначно сопоставить Resource
|
||||
|
||||
**Impact:** Добавить UNIQUE constraint: `UNIQUE(purchase_id, module_id)`.
|
||||
|
||||
---
|
||||
|
||||
### 7.2 Сопоставление Resource с PurchaseItem
|
||||
|
||||
**Decision:** **По module_id и date.**
|
||||
|
||||
**Reason:**
|
||||
1. `Resource.module_id` сопоставляется с `PurchaseItem.module_id`
|
||||
2. `Resource.invoice_date` сопоставляется с `PurchaseItem.date` (если есть)
|
||||
3. Service layer выполняет JOIN и фильтрацию
|
||||
|
||||
**Impact:** Service layer выполняет сопоставление.
|
||||
|
||||
---
|
||||
|
||||
## 8. Consistency with 001–008
|
||||
|
||||
### 8.1 Проверка согласованности
|
||||
|
||||
| Решение 001–008 | Статус | Комментарий |
|
||||
|-----------------|--------|-------------|
|
||||
| **PurchaseItem = ordered** | ✅ | Подтверждено |
|
||||
| **Resource = received** | ✅ | Подтверждено |
|
||||
| **Resource.remaining вычисляется** | ✅ | Подтверждено |
|
||||
| **Resource → Invoice** | ⚠️ | invoice_id должен быть NOT NULL |
|
||||
| **Resource → Specification (nullable)** | ⚠️ | specification_id должен быть связан с Purchase |
|
||||
| **Purchase ↔ Specification M:N** | ✅ | Подтверждено |
|
||||
| **Один Invoice → несколько Resource** | ✅ | Подтверждено |
|
||||
| **Один Resource → несколько allocations** | ✅ | Подтверждено |
|
||||
| **Общий пул проекта** | ✅ | Подтверждено |
|
||||
| **No InvoiceItem** | ✅ | Подтверждено |
|
||||
| **No PurchaseItem → SpecificationItem link** | ✅ | Подтверждено |
|
||||
|
||||
### 8.2 Выявленные проблемы
|
||||
|
||||
| # | Проблема | Severity | Требуется |
|
||||
|---|----------|----------|-----------|
|
||||
| 1 | invoice_id nullable | Medium | Сделать NOT NULL |
|
||||
| 2 | specification_id не проверяет связь с Purchase | Medium | Service layer проверка |
|
||||
| 3 | Нет UNIQUE на (purchase_id, module_id) | Medium | Добавить constraint |
|
||||
| 4 | Module-level validation отсутствует | High | Service layer проверка |
|
||||
| 5 | Over-fulfillment не проверяется | High | Service layer проверка |
|
||||
|
||||
---
|
||||
|
||||
## 9. Accepted Decisions
|
||||
|
||||
### Decision 1: Module-level quantity validation
|
||||
|
||||
**Decision:** Проверка ordered vs received должна выполняться **по Module**, не по общей сумме.
|
||||
|
||||
**Reason:** Бизнес-правило требует соответствия по каждому Module.
|
||||
|
||||
**Impact:** Service layer должен выполнять модульную проверку.
|
||||
|
||||
---
|
||||
|
||||
### Decision 2: Resource.specification_id = provenance на уровне Specification
|
||||
|
||||
**Decision:** `Resource.specification_id` означает "партия относится к Specification", не "закрывает SpecificationItem".
|
||||
|
||||
**Reason:** Specification хранит потребность, не Item-level tracking.
|
||||
|
||||
**Impact:** Service layer выполняет JOIN к SpecificationItem.
|
||||
|
||||
---
|
||||
|
||||
### Decision 3: Resource.specification_id связан с Purchase
|
||||
|
||||
**Decision:** Specification у Resource должна быть связана с Purchase через PurchaseSpecification.
|
||||
|
||||
**Reason:** Business rule: Resource относится к Specification закупки.
|
||||
|
||||
**Impact:** Service layer проверяет связь.
|
||||
|
||||
---
|
||||
|
||||
### Decision 4: invoice_id NOT NULL
|
||||
|
||||
**Decision:** `Resource.invoice_id` должен быть NOT NULL.
|
||||
|
||||
**Reason:** Invoice — источник факта получения.
|
||||
|
||||
**Impact:** Изменить модель.
|
||||
|
||||
---
|
||||
|
||||
### Decision 5: Unique (purchase_id, module_id)
|
||||
|
||||
**Decision:** Запретить дублирование `(purchase_id, module_id)`.
|
||||
|
||||
**Reason:** Избегать неоднозначности сопоставления.
|
||||
|
||||
**Impact:** Добавить constraint.
|
||||
|
||||
---
|
||||
|
||||
### Decision 6: Module в Specification
|
||||
|
||||
**Decision:** Resource.module_id должен быть в SpecificationItem.
|
||||
|
||||
**Reason:** Business rule: Resource относится к модулям Specification.
|
||||
|
||||
**Impact:** Service layer проверяет.
|
||||
|
||||
---
|
||||
|
||||
## 10. Changes Required Before Implementation
|
||||
|
||||
### Priority 1: High
|
||||
|
||||
**Change 1:** Добавить Module-level validation в Service layer.
|
||||
|
||||
**Description:** Проверка `SUM(Resource.quantity) <= SUM(PurchaseItem.quantity)` по каждому Module.
|
||||
|
||||
**Impact:** ProvenanceValidationService.
|
||||
|
||||
---
|
||||
|
||||
**Change 2:** Добавить проверку over-fulfillment в Service layer.
|
||||
|
||||
**Description:** Проверка `SUM(Resource.quantity) <= SpecificationItem.quantity` по каждому Module.
|
||||
|
||||
**Impact:** ProvenanceValidationService.
|
||||
|
||||
---
|
||||
|
||||
**Change 3:** Добавить проверку связи Specification с Purchase.
|
||||
|
||||
**Description:** Проверка, что `Resource.specification_id` находится в `Purchase.specifications`.
|
||||
|
||||
**Impact:** ProvenanceValidationService.
|
||||
|
||||
---
|
||||
|
||||
### Priority 2: Medium
|
||||
|
||||
**Change 4:** Сделать `Resource.invoice_id` NOT NULL.
|
||||
|
||||
**Description:** Изменить модель: `invoice_id` NOT NULL.
|
||||
|
||||
**Impact:** Alembic migration.
|
||||
|
||||
---
|
||||
|
||||
**Change 5:** Добавить UNIQUE constraint на `(purchase_id, module_id)`.
|
||||
|
||||
**Description:** Добавить `UNIQUE(purchase_id, module_id)` в PurchaseItem.
|
||||
|
||||
**Impact:** Alembic migration.
|
||||
|
||||
---
|
||||
|
||||
### Priority 3: Low
|
||||
|
||||
**Change 6:** Рассмотреть Delivery для future enhancement.
|
||||
|
||||
**Description:** Если потребуется tracking отдельных событий поставки.
|
||||
|
||||
**Impact:** Future task.
|
||||
|
||||
---
|
||||
|
||||
## 11. Deferred Questions
|
||||
|
||||
### Question 1: Over-fulfillment policy
|
||||
|
||||
**Question:** Должна ли система запрещать over-fulfillment (получение больше, чем потребность)?
|
||||
|
||||
**Answer:** **Service layer должен поддерживать политику.**
|
||||
|
||||
**Reason:** Business rules могут меняться.
|
||||
|
||||
**Follow-up:** Определить политику (запрещено / разрешено с warning).
|
||||
|
||||
---
|
||||
|
||||
### Question 2: Delivery tracking
|
||||
|
||||
**Question:** Нужно ли отслеживать отдельные события поставки?
|
||||
|
||||
**Answer:** **Нет в рамках v1.**
|
||||
|
||||
**Reason:** Resource уже хранит факт получения.
|
||||
|
||||
**Follow-up:** Рассмотреть если потребуется детальное tracking событий.
|
||||
|
||||
---
|
||||
|
||||
### Question 3: Partial delivery semantics
|
||||
|
||||
**Question:** Как точно моделировать частичные поставки?
|
||||
|
||||
**Answer:** **Через множественные Resource.**
|
||||
|
||||
**Reason:** Каждая частичная поставка → отдельный Resource.
|
||||
|
||||
**Follow-up:** Добавить дату/номер поставки в Resource.
|
||||
|
||||
---
|
||||
|
||||
## 12. Final Gate Decision
|
||||
|
||||
### **PASS WITH CHANGES**
|
||||
|
||||
Архитектура закупочного контура в целом годится, но перед implementation необходимо внести конкретные изменения в design.
|
||||
|
||||
---
|
||||
|
||||
### Изменения перед implementation:
|
||||
|
||||
#### Must Have (до начала реализации):
|
||||
|
||||
1. **Module-level validation:** Добавить проверку ordered vs received по Module в Service layer.
|
||||
2. **Over-fulfillment check:** Добавить проверку против SpecificationItem.quantity в Service layer.
|
||||
3. **Purchase-Specification link:** Добавить проверку, что Specification у Resource связана с Purchase в Service layer.
|
||||
|
||||
#### Should Have (желательно до начала реализации):
|
||||
|
||||
4. **invoice_id NOT NULL:** Изменить модель: `invoice_id` NOT NULL.
|
||||
5. **Unique (purchase_id, module_id):** Добавить UNIQUE constraint.
|
||||
|
||||
#### Could Have (можно после начала реализации):
|
||||
|
||||
6. **Delivery tracking:** Рассмотреть для future enhancement.
|
||||
7. **Partial delivery semantics:** Добавить поле delivery_date/delivery_number в Resource.
|
||||
|
||||
---
|
||||
|
||||
## 13. Summary
|
||||
|
||||
### 13.1 Ключевые findings
|
||||
|
||||
1. **Module-level validation:** Проверка ordered vs received должна быть по Module, не по общей сумме.
|
||||
2. **Specification provenance:** `Resource.specification_id` = provenance на уровне Specification.
|
||||
3. **Purchase-Specification link:** Specification у Resource должна быть связана с Purchase.
|
||||
4. **invoice_id:** Должен быть NOT NULL.
|
||||
5. **Unique constraint:** Запретить дублирование (purchase_id, module_id).
|
||||
6. **Module in Specification:** Resource.module_id должен быть в SpecificationItem.
|
||||
|
||||
### 13.2 Изменения перед implementation
|
||||
|
||||
**High priority:**
|
||||
- Module-level validation
|
||||
- Over-fulfillment check
|
||||
- Purchase-Specification link check
|
||||
|
||||
**Medium priority:**
|
||||
- invoice_id NOT NULL
|
||||
- Unique constraint
|
||||
|
||||
### 13.3 Consistency
|
||||
|
||||
Архитектура согласована с 001–008. Все выявленные проблемы могут быть решены Service layer или minor schema changes.
|
||||
|
||||
---
|
||||
|
||||
**Review завершен. Переход к следующей задаче НЕ производится.**
|
||||